13 articles
Knowledge Base
Incident Response
13 articles in the Incident Response category.
- Translating RTO and RPO for a non-technical CEO Explain RTO and RPO to a non-technical CEO in terms of downtime, lost data and cost. You get a three-part script that compares what your systems can deliver today with what your contracts promise.
- Database backup verification — how to know your restore actually works Backup verification across four levels — storage integrity, schema restore, data restore, application restore — with automation patterns for MySQL, PostgreSQL, and MongoDB.
- Patroni — production PostgreSQL high-availability cluster architecture Patroni PostgreSQL HA in production — etcd quorum, leader election, sync vs async replicas, HAProxy routing, watchdog, and the decisions that determine whether your cluster survives a real outage.
- Patroni failover behavior — what actually happens in the 30 seconds after Patroni failover behavior in detail — the leader-lock expiry, the replica race, HAProxy convergence, the sync-promotion data-loss window, and what the application actually sees during a real failover.
- SLOs, error budgets, and alerts that don't burn out the on-call SLOs, error budgets, and burn-rate alerts that protect the on-call rotation from noise — Google SRE multi-window pattern, symptom-based alerting, runbook hygiene.
- Zero-downtime MySQL major-version upgrade — InnoDB, replicas, cutover Production runbook for upgrading MySQL 5.7 to 8.0 or 8.0 to 8.4 LTS without taking the application offline. Replica-seed strategy, cutover sequence, rollback.
- Setting up on-call for a team that has never had one A team standing up on-call for the first time has to decide six things at once. Here is the minimum viable rotation that does not burn anyone out in quarter one.
- Writing a severity bar that survives growth — Sev-1/2/3 definitions a non-engineer can read A severity definition that only engineers understand fails the first time a CS rep has to classify a customer ticket. Here is the structure that holds at 3 engineers and at 30.
- What to do in the first 5 minutes of a production incident The first 5 minutes of a production incident decide how the next 5 hours go. Here is the senior-engineer order of operations — what to do, what to skip.
- When to declare an incident resolved — and when not to Declaring resolved too early reopens the incident with the customer watching. Too late burns the team. Here is the criteria a senior engineer uses to call it.
- Structuring on-call escalation paths An escalation path that pages the senior engineer for every alert burns out the rotation. One that never escalates loses Sev-1 minutes. Here is the structure that holds.
- Communicating with customers during an active incident During an active incident, what you say to customers matters as much as what you fix. Here is how to communicate without overcommitting or stalling.
- Writing a Sev-1 postmortem that doesn't blame people A Sev-1 postmortem either improves the system or punishes a person. The wording, structure, and review process decide which one you get.