Skip to content

Migration Services

A website migration that makes cutover day boring.

We plan and run the move for SMBs leaving shared hosting, an unmanaged server, or a cloud no one understands. Discovery first, a staging site you can review, and a tested rollback before we touch DNS.

Best fit when the original setup is fragile, the person who built it is gone, or you cannot afford the kind of downtime that happened last time.

Why migrate now

The move is safe. Cutover-day surprises are the risk.

Most SMBs put off migration because the last one hurt: hours of downtime, broken email, lost orders, and nobody owning the rollback. We run migration as an operational project so nothing on cutover day surprises you.

  • Last migration broke email or took the site down for hours.
  • The developer who set it up is no longer reachable.
  • Locked into a managed host whose bill keeps growing.
  • A previous engineer left behind AWS sprawl no one understands.
  • DNS, SSL, or cron jobs only became a problem at cutover.
  • No rollback plan if the new environment misbehaves.

How a migration runs

Five steps from fragile platform to stable launch.

  1. 01

    Discovery

    Audit hosting, DNS, email, database, files, plugins, integrations, SSL, and backups. Document what is really there.

  2. 02

    Target architecture

    Recommend the destination that fits your workload, traffic, budget, and support needs. Not the most expensive one.

  3. 03

    Staging migration

    Build the new environment, move the workload into staging, test it, and share a preview URL you can review.

  4. 04

    Cutover plan

    Set DNS TTL, schedule the launch window, lock the rollback plan, and brief stakeholders before anyone touches production.

  5. 05

    Go-live and stabilize

    Run the cutover, monitor traffic, resolve post-launch issues, and stay on hand the day after.

How a migration unfolds

A migration timeline you can plan around.

A typical Stack Harbor migration runs 6 to 8 weeks from discovery to stabilization. Below is the working timeline — phases, gates, the DNS-TTL ramp before cutover, and the risk markers we watch.

W1
W2
W3
W4
W5
W6
W7
W8
  1. Discovery
  2. Target architecture
  3. Staging build + sync
  4. Validation + dry-run
  5. Cutover + stabilize
DNS TTL → 300s
Freeze · final sync
Cutover window
Stabilize check
Risk markers we watch
  • DNS
    TTL ramp, propagation, mail records
  • TLS / SSL
    cert provisioning, renewal lock-out
  • Database
    final delta sync, data drift, cutover lag
  • Email
    IP reputation, SPF/DKIM/DMARC, blacklists
  • Cache / CDN
    invalidation, origin shielding
  • Plugins / APIs
    env-specific config, secret rotation
phase gate risk surface

Types

Migrations we plan and execute.

  • WordPress host migration
  • Enterprise WordPress replatforming
  • cPanel to managed cloud
  • VPS to managed infrastructure
  • AWS/Azure/GCP cleanup or transition
  • Agency portfolio migration
  • Performance rescue migration
  • Legacy hosting consolidation

Pricing model

Fixed-fee quote after discovery.

Discovery is a small, paid scoping engagement that produces a written migration plan and a fixed-fee quote. You decide whether to proceed before any production work starts.

Pricing drivers

  • Site or workload count
  • Data and file size
  • Dependency complexity (plugins, APIs, integrations)
  • Downtime tolerance and cutover window
  • Compliance or data-residency needs
  • Post-launch support window

FAQ

What SMBs ask before signing.

  • Will the site go down on cutover day?

    No visible downtime is the target. We stage the new environment, sync data in a low-traffic window, lower DNS TTL ahead of time, and flip traffic once staging matches production. If something looks wrong, we roll back to the still-live old host.

  • What happens to email when we move?

    Email is the biggest reason SMB migrations break. We map MX, SPF, DKIM, and DMARC in discovery, leave mail on its current provider if it lives separately, and touch only the DNS records that have to change. Inboxes stay reachable through cutover.

  • What if something goes wrong after we flip DNS?

    Every migration ships with a written rollback plan. The old environment stays online and read-only until the new one is confirmed healthy. If a critical issue surfaces, we revert DNS and fix it in staging before retrying.

  • How long does a typical SMB migration take?

    Most single-site WordPress or cPanel migrations run two to four weeks: one week of discovery, one to two in staging, then a scheduled cutover. Multi-site portfolios and database-heavy apps take longer. Discovery sets the timeline before any work starts.

  • Do you migrate WooCommerce orders, customers, and subscriptions?

    Yes. We sync orders, customers, products, subscriptions, and payment gateway configuration, then run a final delta sync at cutover so no orders are lost. Stripe, PayPal, and recurring billing are tested end-to-end in staging.

  • The person who set up our hosting is gone. Can you still migrate it?

    That is the most common starting point. Discovery audits the live environment, reverse-engineers dependencies, documents what we find, and proposes a destination. You get a clean handover even if nobody on your team knows the original setup.

  • What is involved in a website migration service?

    A website migration service starts with discovery: an audit of hosting, DNS, email, data, and dependencies so the move is mapped before anything changes. Then a target architecture sized to your workload, a staging build you can review, and a written cutover plan with a tested rollback. The deliverable is a predictable launch.

From the knowledge base

Migration operations, depth reading.

Migration patterns, recovery runbooks, and post-cutover stabilization guides.

See all Migration articles

The next migration should feel boring.

Book a migration assessment. You leave with a written plan, a fixed-fee quote, and a clear picture of cutover day.